Archives

  • Archives
  • >
  • Home

DOI : ,    Vol.5, No.4, 13 ~ 18, 1997
Title
Modified Soil Trench Process for Small-Scale Sewage Treatment
임재명Jae Myoung Rim,김병욱Byeoung Ug kim,강성환Sung Hwan Kang
Abstract
This research aims to improve the previous trench process. The modified process is consist of 3 processes; first settling tank, 3-staged second contact-filter, and last trench system. The experiments was operated by varying the HRT 8, 6 and 4 hours in trench. The results of laboratory experiments showed removal rate of 97∼99% of TBOD, 92∼98% of TKN, 91∼98% of T-P. From the results of this research, organic materials were removed in settling tank and nutrients in the trench stage. Therefore, it is recommended to replace the previous 3-staged contact-filter to 1-staged one, and to increase contact-time in trench system.
Key Words
pdf view PDF